SKF to service Berlin underground carriages in long-term agreement
<p style="text-align: center;"><img src="/ueditor/php/upload/image/20210818/1629269888122231.jpg" title="1629269888122231.jpg" alt="1.jpg"/></p><p>Service agreement for U-Bahn trains includes original part supply and service for at least 606 carriages ¨C and will last for a 32-year period minium.</p><p><br/>SKF has signed a long-term agreement with Stadler Rail to equip and service rolling stock for the Berlin underground (U-Bahn) in Germany. <br/><br/>The contract, with Swiss rail vehicle manufacturer Stadler Rail, is worth several million Euros. It includes a number of SKF solutions ranging from wheel set bearings and axle boxes to lubrication systems. Over the more than 32-year duration of the contract, SKF will cover spares supply. The contract is covered by a performance agreement, which is measured against a set of KPIs to ensure high customer confidence. <br/><br/>¡°This contract will provide reliability and safety of spare parts over the entire period,¡± says Thomas White, Key Account Manager for Railways at SKF. ¡°This aims to reduce logistics efforts and raise reliability for both the train operator and Stadler Rail.¡± <br/><br/>Under the agreement, SKF will service more than 606 rail carriages, to be built between 2022 and 2026. This may extend to a total of 1,500 carriages. Berlin U-bahn operator, Berliner Verkehrsbetriebe (BVG), has said that this is the largest vehicle purchasing programme in its history ¨C with a budget of around €3 billion for up to 1,500 carriages. <br/><br/>Overall, the SKF contract will involve the supply and servicing of more than 12,000 wheelset bearings, among other services. The wheelset bearings are insocoated ¨C so have a plasma coating to prevent electrical damage. <br/><br/>SKF¡¯s long-standing relationship with Stadler, its ability to offer a broad service package and its technical expertise were key factors behind winning the contract. SKF was also involved in the very early phase of development ¨C developing product solutions that were tailored to the customer¡¯s needs. <br/><br/>The service contract aims to help to improve the reliability and uptime of trains on the U-Bahn. <br/><br/>SKF can support rail manufacturers to meet their RAMS (Reliability, Availability, Maintainability and Safety) and LCC (Lifecycle Costing) responsibilities, a key factor in modern rail stock performance. </p><p><br/></p>
18 Aug,2021